Excavation Quantity Calculation: Complete Guide for Foundation Earthwork as per IS 1200

Excavation Quantity Calculation | Earthwork Estimation as per IS 1200 | Civil Billing

⛏️ Excavation Quantity Calculation: Complete Guide for Foundation Earthwork as per IS 1200

Foundation Excavation | Earthwork Estimation | Measurement Sheet | Deduction Norms

✓ IS 1200 (Part 1): 1992 | IS 3764 | CPWD Specifications

📲 Get Free Excel BOQ Sheet

Join our WhatsApp channel to download the complete excavation measurement sheet (C1 to C13 footing calculation) in Excel format.

📱 Join WhatsApp Channel 📥 Download Excel BOQ Sheet
⚠️ Join WhatsApp channel first to unlock Excel download

🔒 After joining, refresh or click "Check Status" to activate download

Excavation Quantity Measurement Sheet - C1 to C13 Footings
📋 Excavation Measurement Sheet (C1 to C13) as per IS 1200
📐 Foundation Excavation Quantity Calculation
Up to 1.5 ft depth as per IS 1200 (Part 1): 1992
📜 IS Codes: IS 1200 (Part 1):1992, IS 3764:1992, IS 4081:1986, CPWD Specifications
Excavation Volume (cu.ft) = Number of Footings × Length × Breadth × Depth

📊 Excavation Measurement Sheet (13 Footings)

Footing IDNo.Length (ft)Breadth (ft)Depth (ft)Quantity (cu.ft)
C1, C1025.755.51.594.875
C2,C4,C5,C7,C8,C966.05.51.5297.0
C3, C1125.755.51.594.875
C616.255.51.551.5625
C1215.55.251.543.3125
C1315.255.01.539.375
Total Excavation621.0 cu.ft (17.60 m³)
✂️ Deduction Norms as per IS 1200
  • Clause 2.4.1: NO deduction for volume occupied by concrete, sand filling, or reinforcement.
  • Clause 2.1.2: NO deduction for shoring/timbering.
  • Conclusion: Full 621 cu.ft is billable.

🧮 Interactive Excavation Calculator

0
cubic feet (cu.ft)
💰 Billing Format & Rate Analysis
CPWD DSR 2026 (Indicative Rates)

Final Excavation Billing Statement

ParticularsAmount (₹)
Excavation (17.60 m³ × ₹250)4,400
Disposal (17.60 m³ × ₹80)1,408
Subtotal5,808
Contractor Profit @15% + Water@1%929
GST @18%1,213
GRAND TOTAL₹ 7,950
💰 PCC, sand filling, and footing concrete billed separately.
❓ Frequently Asked Questions
1. What is IS 1200 Part 1?
Indian Standard for measurement of earthwork (excavation, filling).
2. Are deductions applied for concrete in excavation?
No. IS 1200 Clause 2.4 states NO deduction for concrete, sand, or reinforcement.
3. How to get Excel BOQ sheet?
Join our WhatsApp channel using the green button above, then download link activates.
4. How to convert cu.ft to cu.m?
Divide by 35.315 → 621 ÷ 35.315 = 17.60 m³.
5. What is working space allowance?
Minimum 0.3m (1 ft) extra on each side as per CPWD.

📊 Excavation Quantity Summary

Total Volume
621 cu.ft
17.60 m³
No. of Footings
13
C1 to C13
Depth
1.5 ft
0.457 m
Bill Amount
₹ 7,950
(Incl. GST)
✅ Deductions Applied: NIL (As per IS 1200)